GALA 2010 - 06.08.2010.

* General: added option to change the server to download updates
* General: optimized working memory (RAM occupancy), and fixed error with occasional interruptions of the program (black background)
* General: Due to reports of viruses, we gave up the compress executables
* Organization: Connect / Disconnect / separation of activities is possible and after activities are assigned to WBS, but the new activities need to manually assigned to the WBS
* Organization: the activities can be planned with more subcontractors
* Work orders: under certain conditions, display the value of working hours not worked well
* Work orders: input realization of the machine and delete the same, reported the error in the table "machinery on the site"
* Work orders: Option to add more Subcontractors on Items of working order
* Reports: added 4 new reports for Evidence of working time

GALA 2010 - 19.07.2010.

* General: Import estimate, materials, subcontractors, employees from MS Excel is accelerated (500 items for 7-8 seconds)
* General: Added weather forecast with the possibility of archiving and printing (Global Call menu, Organization and Dynamic Plan)
* General: Beside export/import of materials in MS Excel, added export/import of machines and workers (Menu Motherboards-> base of machines and workers)
* Staff: Mark (tag) employees, export selected records
* Estimate: by estimate copying (Global Menu-> Copy) added view of whole item
* Dynamic plan: the ability to input the cost of the activity (Gantt chart)
* Dynamic Plan: mouse click on the activity table or Gantt chart to the area, Bar moves into the visible area. Click on the bar has no effect.
* Dynamic Plan: solved bug in saving a baseline when the activity was shifted outside the start / end of the project
* Payment certificate: When creating the first payment certificate, the transfer of the rebate/bonus/debited from estimate

GALA 2010 - 07.07.2010.


* General: when downloading the new version, the indicator shows the duration
* Estimate: Import from MS Excel file not worked if the sheet is not called "Sheet1"
* Operational Plan: Activities view was not refreshed properly
* Organization: Added field cost (on activity)
* Organization: Insert of activity opens the form with the resources, duration and start/end date
* Dynamic Plan: command Finance automatically displays financial columns in the table, regardless of whether they are involved in setting

GALA 2010 - 29.06.2010.All existing users who have contracted the maintenance (or new users), receive a IFC 3D module free of charge.

* General: added translation of the Montenegrin language
* General: Calculator is not transmitted (in the field that was called) quantity greater than 1000
* General: GAEB export and import includes the evidence of quantity (of the items of expense), and IFC projects
* Items on the evidence of quantity, added new fields - depth/height, width, number of pieces
* Items: added pštion to call a procedure for evidence of quantity on the right click (on a table of items)
* Items On multiple entry items window, added split-screen options (left / right / up / down)
* Estimate: on the multiple listing items (additional treatment) added the option of opening MS Office documents and drag & drop or copy and insert the item, IFC to work with 3D models (creation of items, evidence of quantity, the calculation of the object (wall, beam, column, area, plates ...) for the current floor or the whole object, a display layer (layers) of objects, eg wall: bricks, insulation, plaster) with the same thickness, show the selected object or the floor of the project (Eg display only the walls), etc.

Working with IFC 3D models.

Programs like Autodesk Revit, Graphisoft ArchiCAD, Tekla, Nemetshek Allplan - have the option to save the project in the 3D model. Therefore, we are developed a linking of all major CAD software programs with GALA, and connected them on the "natural" way. CAD project(s) can be opened on the same window in which the estimate items  and interact with items. IFC models contain information about each element (Walls, beams, columns, spaces, slabs, roof, stairs, doors, windows etc.) and to their length, width, surface and without holes, the volume and without holes, etc.

IFC Modell

That's why we created the possibility of listing the amount of the type of element (eg wall) for the current floor or all floors, view all the elements for floor or project, presentation of the various elements of the floor or the project (only the walls with beams and columns), etc. On the Mouse Click the program sums up the same types of values and thus making evidence of quantity or items of expense. In the first place those values are 100% is correct, about the speed we say that a complete cost estimate of the average family home can do for ten minutes.


GALA 2010 - 19.04.2010.


* General: Help system updated to the current version
* Bill of Quantities: Subitems are renumbered (in the description) because avoiding to have same description many time. Same on subitems on operational plan.
* Bill of Quantities: by export to the GAEB file, if name of project was smaller as 8 letters, file was not correctly written.
* Book of quantities: Insert quantity, and press Enter key, is not calculated value of Payment Certificate. It is needed to click on OK.
* Book of quantities: Quick enter (quantity or cumulative) and escape by click on X, was not calculated value of Payment Certificate.
* Reports: Report was not OK under some conditions
* Reports: Report of monthly income/expanse - columns are resized, so it can hold bigger numbers
* Gantt chart: accelerated calculation of income/expense for month, fixed bug by last day on month if it was non-working day


GALA 2010 - 10.03.2010.

* General: If the Bill of Quantities was not selected, but moved to the OP and activities brought the material, the program reported an error related to price list. On the material modification, material factor was wrong calculated

* Materials: Save of material was possible without code
* Materials: Drag / drop of material in the registers is entered in the register of all new price lists in the base material (instead in the current price list only) 
* Organizer: on the needed resources preview, added an additional type of chart


* Organizer: by the conversion or reset a setting, position of email window was not good 
* Organizer: Fixed preview of resources (number of employees) - in languages other than Croatian 
* Organization: Fixed Previous/Next operation (on the activity window)
* Organization: Export activities (for subcontractors) in MS Excel prints and descriptive name for the item (if different from the activities) 
* Organization: Insert of activities in WBS item moved from outside the same window 
* Bill of Quantities: Added import and export in XML format GAEB (www.bvbs.de)



* Bill of Quantities: Export and import quantities in the MS Excel export includes the general conditions (technical description) 
(sample quantities: C:\GALA\Template\Import quantities with the desc.xls) 
* Bill of Quantities: Export to MS Excel includes items with no quantity or price or both 
* Bill of Quantities: Import items from MS Excel and descriptive items (subitems) highlights below descriptive 
* Bill of Quantities: Export of Subcontractor items in MS Excel prints and descriptive name for the item (if different from Subcontractor items) 
* Organization: adding activities in the organization takes care of descriptive items in a way that the "thrust" activities descriptive items. 
It is the same with items that have more activities (analysis). The Gantt view the items clearly differ from the activities. 
* Warehouse: Added a process that reduces the state warehouse to 0.
* Payment Certificate: The statements (BoQ part) fixed small differences (relative to the value of the situation) 
* Report: report added - printing single division (in the Bill of Quantities)


GALA 2010 - 13.02.2010.


* General: Reports on the level of the company - the need for hours by type of workers, the number of employees, material, machines for hours and number of machines


Resources reports

* Preferences: Backup MSSQL database is doing in C:\GALA\Files\Backup\ folder on the server 
* Items: Moving up was not good, if within a species there are descriptive items (underlined) 
* Items: Enabled move items (within species) drag & drop method

Drag & drop

* Items: Enabled underlined move items within the same parent 
* Items: Enter additional descriptive items (which is not underlined, but is within items as standard) is not possible if there is OP or situation 
* Items: Command (Button) entry under certain conditions was not always visible 
* Report: Moving the report (up / down) was not well 
* Materials: export / import of materials in MS Excel, with the updated database material in all price lists
* General: Installation of the client, shared directories does not load immediately, but after the call. Manual entry of the directory server. 
* Prices: The price list of materials and provided the basis material transfer or assign the registry, drag & drop method 

Export Import

* Report: Reports added print resources for the period, listing selected resources by day, listing all the resources for the selected date 
* Report: The preview in the report was not possible to export the report 
* Report: Fixed sorting items in the report, Building the situation - the difference amounts 
* Report: Print status of the warehouse did not work under certain conditions 
* Working hours: the input of working hours (simultaneous users) program is sometimes reported an error loading the employees

 

GALA 2010 - 25.01.2010.

* Projects: the possibility of archiving of projects
* Warehouse: On the review of the warehouse, initially display only the active and standard storage
* Organizer: possibility of not using Microsoft Outlook email (program settings)
* Organizer: After entering a new project, the new project was not selected
* Organizer: On the business partners and projects added the display of Finance (Accounts and situations)
* Organizer: On the business partners (or contact) allowed to send email
* Organizer: Review of project speeded up
* Organizer: On the projects added the chart that shows the status of the project (red/green) on the basis of derived/spent
* Payment certificate: by the development of the Payment certificate, the program carries about recapitulations (bonuses, discounts ...) from the previous Payment certificate (optional)
* Payment certificate: by the update of the Book of quantities, added the possibility of entry of monthly values, where is calculated monthly and the total amount
* Accounts: Number of documents are counting on the basis of the document type (invoice, bill for advance ...) and for the current year
* General: on all fields (on the right-click) added commands Copy / Cut / Insert
* Operating plan: the creation op. plan, a description of the item is connected with descriptions of descriptive items and activities
* employees: Table employees did not update the other data (medical, etc.)
* Employees: The employees table has field active, able to filter
* Organization activities: added commands Next / Previous. If there is realization, the activity is skipped.
* Book of quantities: added commands Next / Previous (on item).
* Warehouse: when selected project has no order, checkbox "Only the current plan" is not properly filter the data on orders
* General: in the version without the organizer, returned search on projects and faster filtering
* Situation: enabled VAT change
* Dynamic analysis: if option "Links type" is set up, opened is window with link lag
* Reports: on all financial reports added OIB (personal identification number)
* Reports: on all working hours added sort by date
* Dynamics: faster load the S-curve
* Dynamic analysis: Templates added to the left side of window,for quick view
* Organizer: (Projects) Rapid filtration project for the selected classification
* Organizer: (Projects) columns derived, reflection, calculated are immediately visible and are updated on each change of expense, work order, the situation
* Dynamics: optimized opening of gantt chart, financial columns are updated on demand (click on "Finance")
* Dynamics: gantt view by day, week or month is active by default
* General: Added OIB (personal identification number) in the data on licenses to users and business partners
* Organizer: The Archived messages, folders from Outlook, was not good read
* Copy of expense: Division copy (without items)
* Copy of expense: It is possible to delete the item type that has no or subspecies, the possibility to delete items (right click)
* Projects: Changing the client's project re-enabled (it was banned), with the changes in customer bills of quantities, but not on existing Payment certificates (a new customer is entered when creating a new Payment certificate).
* Items: Added right-click scrolling items (items of expense)

GALA2010 - 14.12.2009.

* New module: GALA Organizer - Projects, Email (Outlook), Diary, Tasks, Calendar, Notes, Documents, Partners)
* Projects: the project selected, the display option contracts bill of quantities, Op. plans, Payment certificate
* Projects: Contracted version, done, spent, calculated
* Projects: sorting, grouping, moving column

Projekti


* Email from Outlook (2003 or 2007) with all functions (Send, Receive, Reply, Forward ..) with the possibility of adding a mail-in or daily tasks

Email modul


* Diary: unlimited number of categories, an entry based on the organizational structure of enterprises
* Tasks: categories, partners, Re. person project. Input / review based on access rights (Task Organizer)

Zadaci


* Calendar: visual inspection tasks per day / week / month with the filters by category and Responsible people

Kalendar


* Notes: internal visual recordings related to the currently logged users are not visible to anyone else

Bilješke


* Documents: all documents in one place, divided by 8 basic categories with an unlimited number of projects + subcategories for the project, bill of quantities, investors

Dokumenti

* Partners: The connection with the diary and tasks, send an email.


GALA2009 - Changes to 05.11.2009 - available for upgrade

* General: added the organizational structure
* Standards: Changing the papers did not update the new name. Changed and added on to double-click.
* Items: What does extra analysis, calculation of the items must be free
* Consumption of material: under certain conditions spent printing materials is not well displayed

GALA2009 - Changes to 24/09/2009 - Now available for Upgrade

* General: For all single-valued processes defined windows (copying, typing, display mode of the processing, etc.)
* General: For critical bugs added to the window with the possibility of copying error description. Text errors are also written in Log.txt server.
* General: Built-in templates to remember column width for all of tables in - by a particular user
* General: short date settings (from the Windows settings) are checked in the registry and must be in the format dd.mm.yyyy
* General: logo was not properly read by the printing editor
* General: Selection of printer that is not standard (for printing) is not working properly
* Projects: The projects (right click) Added new command (Info, documents, bill of quantities)
* Projects: The investor must not modify the project if there is a bill of quantities (as the ID for other investors write tables) - alternative: copy bill of quantities
* Projects: added ability to make the project a zero rate of VAT
* Payment certificate: Consumption of material added to the process: the amount of entry bookkeeping (from the planned amount)
* Payment Certificate: When entering a new cumulative value, Payment certificate is not entered, but only while making the items of the book.
* Book of quantities: certified copy quantity is derived from the amount, if the quantity changes derived
* Items bill of quantities: Mark items with input items (if any descriptive items - underlined) is not well counted - also at a multiple input
* Items bill of quantities: The transfer of resources in the form of an item is not entered by the type workers if it is not in the standards, which created the problem by< saving the baseline in the dynamic field
* Items bill of quantities: the transfer of resources is transmitted material resources and machinery for the analysis of how the transfer of selected analysis that has auxiliary analysis
* Items bill of quantities: the realization of how much more there is left for the item (analysis) at remuneration (with bill of quantities), program reported the error for each analysis of the realization - once is enough
* Items bill of quantities: Under certain circumstances, paragraph of bill of quantities has not received a bookmark that is standardized (Enter item -> fine with input from the norms of the book -> Input not normed consumption -> transfer of resources
* Items bill of quantities: The entry type of subcontractors, the program is for descriptive items (items that have been inserted) created an additional subparagraph, which created the problem of construction. books.
* Network plan: If Croatian language is selected, than there is no need to enter a translation settings for charts (financial and s-curve) - fast load
* Network plan: icons added to the gantt chart (Gantt bar) - on each activity (Gantt bar) can assign up to 6 icons. Icons are located inside a Gant, and selected columns outside.
* Network Plan: Reports are divided in the print / preview and print resources of the Gant (call from the menu on right click)
* Plan Network: Balance at added only for the current activity
* Report: Corrected Payment to display the amount of which any certificate with the VAT rate is different from the one currently on the project
* Report: Added-Realization of the report date until the date - print consumption and earnings for the selected period
* Report: import of statements can be done form a client computer
* Report: added 4 reports for printing employee benefits (for op. Plan or project, all employees and by employees)
* Report: added 3 reports for analysis of print items - quantity 1 (normative and converted) and for the total amount of

GALA2009 - Changes to 06/08/2009.

* General: Language module is completely redesigned and supports up to 30 languages (including Cyrillic script)
* General: The application is fully translated in English language
* General: Updated help files, made a new video film
* General: Processes updates about the record and written to the file
* General: Logo can be selected only from the \\Server\Gala_Software\Images\ directory
* General: Skins are selected only from the \Gala\Images\ directory (local)
* General: Transfer descriptive paragraphs in the OP and the situation (with VTR command) is not always well communicated tag items
* General: After backing up, in what is defined email address (in the settings of the program) sends a notification to this email
* General: New Calendar in Office2007 style
* Projects: enabled change VAT rates, although there payment certificate
* Bill of quantities: The renumeracije items, "underlined" (descriptive) items are skipped
* Bill of quantities: The copy bill of quantities or types of work (with items) descriptive items are not copied well
* Bill of quantities: For multiple entry items, type of employee is not in the position of upisivao (if he was not enrolled in a position to book standards) - it is necessary to save the baseline in MP
* Bill of quantities: The table bill of quantities of items added to the column of the work, materials and machines (jedinično and total)
* Reports: Report Standard bill of quantities - is not case letters report value under certain conditions
* payment Certificate: In the standard print statements recapitulations VAT at how print payment certificate containing different rates (recap VAT is printed)
* payment certificate: On the table construction. books added to the column amount of the bill of quantities, certified and approved a total of
* payment Certificate: In the form of construction. books are not certified amount is updated automatically, but visually demonstrates the difference in relation to the constructive
* Operating plan: No plan if there is a clear working order, the realization of work, the realization of the material or the realization of machines
* Network plan: After the separation of activities (at state) and separate activities (those that are 100% ready) become part of a WBS (Summary Bar)
* Network plan: Added display for financial items, WBS-this and the project (planned cost, realized cost, the remaining cost, the planned revenue, income, residual income,% of execution)
* Network plan: Added display for financial WBS-those of graph
* Network plan: columns of financial data may be visible to the activity (in the Gantt view)
* Network plan: Open a saved baseline-enabled direct examination of the S-curve
* Network plan: In all possible histogram at the same time see the early and late dates
* Network Plan: The S-curve view, the table can be hidden
* Network plan: Optimaliziran version of S-curve
* Work orders: The choice items of work orders, added to the display readiness (in%) in how much activity on the network plan
* Work orders: If the activity of the milestone, the choice of activities for the implementation is not possible
* Work orders: If an activity that was performed was not selected (highlighted), and pressed the "Options", the program showed an error that there is no activity
* Reverse the tool: The tool review issued by officer added an icon indicating that the employee released a tool
* Reverse the tool: The ability to automatically receiving the tool without receiving at warehouse
* Warehouse: Added review of material in all warehouses with state of the material
* Warehouse: The material (Basic codes), the material in stock, and all 5 documents added to the storage of materials for review within
* Warehouse: Under certain conditions on the input warehouse transfer note could delete
* Warehouse: Optimaliziran display card for materials

GALA 2009 - version from 08.06.2009.

* General: In Windows, the settings you need to have custom font size (DPI) at the standard
* General: Export could not do if the file was a sign "\" or "/"
* payment certificate: In addition to listing the agreed amount to the project enabled the amount and payment certificate
* Report: report added Payment Building certificate - all items in  BoQ part - Recap by type
* Network plan: the possibility of "decoupling" of activities in the Gantt view in a way that for a given date the program started activities defined as 100% and ready to make the remaining amount of new activity in the same order.
* Network Plan: S-curve may not be called for projects that last less than 10 working days
* Network Plan: S-curve (late date) is not well demonstrated under certain conditions
* Network plan: The Histogram all value added per day
* Network plan: possibility to enter directly in the realization of activity, jumping change
* Network plan: WBS items (and design) have the following information in the table, start (or project WBS items), end, duration, working days, non-working days
* Network plan: Added descriptions of activities with Gant (the user can choose which columns of the table contains the description, with the possibility of positioning the left, center, right)
* Network Plan: State of the day working on a way to determine the duration of the new activities to the execution of activities from which he emerged.
* Network Plan: S-curves are shown for the activities that have a baseline, and if an activity does not, it shows the message
* Network plan: option to show only the S-curve (no tables)
* Network Plan: The S-curves added to the trend - green line continues after the last day of the realization of the remaining (blue) activities, as well as trend and end of project
* Network Plan: S-curves can be zoomed (version is possible to the level of days).
* Network Plan: The S-curves added numeric display with a mouse crossing
* Bill of quantities: The import bill of quantities from MS Excel, added to the query on the takeover marks the last activity that is connected
* Bill of quantities: export bill of quantities in MS Excel is an adder items if there were descriptive (underlined) item
* Analysis (cube): added templates: bill of quantities, subcontractor, Types of work
* Analysis (cube): If there is no operational plan, the analysis may not be called
* Analysis (cube) solved the problem when the item or activity was the amount of 0
* Work Order: the realization always write from subcontractor organizations, unless there is not defined. In this case, is taken from the OP.
* Work Order: Optimaliziran select items of work orders
* Realization of (work): Increased view table of employees, reduced chart
* Realization of (work): Employees are sorted alphabetically, added locator
* Warehouse: Warehouses are sorted alphabetically, added locator
* Book standard: Optimalizirano download the standards in paragraph bill of quantities


GALA 2009 - 25.04.2009.

* General: New module - dynamic analysis (Cube), with the possibility of defining the layout, filtering (query on the database), export to MS Excel. Dynamic analysis added to the OP and implementation
* General: added a table for other information about employees (eg medical examination etc)
* General: conversion, check the table with a unique key (call is a possible program settings)
* Network plan: Added move the entire project for the given number of (+ or -)
* Network plan: Recalculation life activity shall be executed immediately after entering the implementation
* Network plan: Added a choice of 5 colors gantt chart
* Network plan: Print of the Gantt in the image (JPG, GIF, BMP ...) or PDF, with the possibility of sharing the site to A0
* Network plan: Change the calendar to an existing network plan is not well demonstrated holidays
* Network plan: For display period of days have been removed decimals
* Items: Added process to increase the amount of tagged items
* Items: The possibility of multiple labeling and analysis of switching from a book standards in paragraph (possibility of labeling standards for various types of works)
* Warehouse: Display only active or all storage
* Warehouse: No clear the OP if there is order for the same material
* Building Book: Value Added - a calculation field
* Construction of books: Added field total quantity
* Warehouse (Order): Overview document for the current OP and all plans
* Warehouse: Remove filter the projects for the storage and added to the active / inactive storage (at the election warehouse)
* Warehouse: For orders added to the filter Warehouses for the current OP and all plans
* Warehouse: standard, machine or vehicle
* Book standards: optimized to work with entering, modifying, deleting data
* Organization: Added export of subcontract items for MS Excel
* Organization: The form of the duration of the activities, added fields subcontractor and subcontractor price
* Work Order: Added  import of subcontractor items from MS Excel (derived quantities)
* Work Order: The realization of the input items, RN, the possibility of entry / changes subcontractor and / or cost subcontractor

GALA 2009 - 17.03.2009.

* General: Mandatory selection of units of measure from the table
* General: Prior to the upgrade, the program checks whether the database is open and if it is, it shows a message and stops the upgrade
* General: Added right of access to review / update hourly employees
* General: Added  Association facsimiles at Re. person to print the document
* Analysis (OP): Added price for subcontractor to print the value of the OP subcontractor
* Organization: Clear screenings (Calendar) removed from the windows and put on right click
* Network plan: The possibility of views of all or selected activities in the Histogram
* Network plan: The possibility of review or in-line histogram in columns
* Report: Added report Payment Building certificate - derived works under the certificate Payment
* Report: Prints the working hours (detailed) with printed lessons and building site
* Report: Print construction. books (current and all newspapers) with fax
* Report: Added a report for the month Created by subcontractor
* Registers: In addition to scrolling up and down, added left-right
* Book standard: Vertical scroll bar not showing on the part of the norm
* Import of material: Whne importing the material in thebill of quantities or operating plan, we added prices as well
* Work orders: the possibility of copying the work hours of other work orders
* Created by: Creating delivery note from the realization of material (by work order)
* Created by: Print Group Added to the realization of the work order
* Created by: The entry of the working hours (in working order) added a table to enter other consumption (transport, waiting, sleeping, etc.)
* Građ. Book: The possibility of fast input volume (for the current month) added on the cumulative amount of input options

GALA 2009 - 10.02.2009.

* Items: Unit can be chosen from a combo box (multiple entry)
* Operational Plan: Prohibited changed the calendar used in an OP
* Network plan: When maximizing the window gantt chart is not properly increased
* General: If you run the program through a network, it shows a message on the Prohibition of termination of the program and execute
* General: The Stem settings added calendars
* Projects: Selected date (the calendar) did not record (equivalent to a person for enforcement of occupational safety)
* Projects: The choice of tables is reported that the user has no rights if PROJ: Register writes 0 (belonging to the classification of all projects)
* Created by: Renamed the name of a tab to be clearer where it is evidence of quantities for construction. book.
* Created by: Added button for evidence of construction quantities. Books
* Created by: Changing the date of work order is not updated in hours 
* General: Remove checks whether the user is an administrator (with updates)
* Bill of quantities: The Info-in bill of quantities added to the column of the work, materials, machinery, value and percentage of TZS
* Standards: Moving types of works in all directions
* Standards: Moving the norm within a species
* Report: Added report working hours for the OP - a detailed listing by type of employee
* Report: Report (of projects) for the agreed bill of quantities is not good
* Report: Standard bill of quantities - recapitulations by type
* Report: Contract bill of quantities - recapitulations by type
* Report: Report: Standard bill of quantities - at cost points

GALA 2009 - 04.12.2008.

* General: System support updated to the current version
* General: Added table unit
* General: Monthly license is tied to your computer ID
* Warehouse: Added a document entitled "Orders". Production orders is available from the warehouse, or from a network plan.
* Warehouse: Receipt, Direct write the situation and small tools and inventory
* Warehouse: Reverse of mall tools, each tool is represented by employees or employees with more tools
* Warehouse: Create new documents from existing storage (e.g. requests, receipt, etc.)
* Projects: Removal of rounding entries advance
* Bill of quantities: Updating quantity in subcontractor bill of quantities was not possible in MS Excel 2000 version
* Bill of quantities: The maximum number of items for import from MS Excel and increased to 20,000
* Bill of quantities: When importing; bill of quantities from MS Excel and merge items, quantity, dimension, the price extracted from last illuminated entry
* Items bill of quantities: Cost significant items (TRZ) - items that are (in relation to the amount and number of items) the most important
* Prices of wok: Editing of the current record was not synchronized
* Prices of materials: After entering of a new material (a form item), entered material was not selected
* Analysis of prices (paragraph bill of quantities and OP): Outputs the amount for 1 unit of measure, added to the total analysis
* Payment certificate: enabled recapitulations (or deposit bonus) without VAT
* Editor: added command "logo" - logo inserted into the document (for documents related to the project, partners or bill of quantities)
* Report: Added 11 new reports (storage-reverse, construction. REGISTRY Payment certificate (NN form))

GALA2009 - 07.11.2008.

* General: save settings per user in the case of work over TS
* Projects: Assigning Rights Re. person in the classification of projects
* Projects: In addition to selecting the last active project, the program selects the last project classification
* Report: Print the value of contracted bill quantities for selected projects
* Report: Print all contracted bill of quantities from project to recap the bill of quantities
* Report: Print of  Payment certificate recapitulations contains the bill of quantities for all items and only if carried out
* Report: bill of quantities - a short analysis
* Network plan: The possibility of inspection activities that have not started - on the selected day
* Network plan: With the entry of realization of activities, we added the input of quantities  with gant
Payment certificate *: Enabled arbitrary registration deadline for certification and the due date on the form
* Payment Certificate: When making,  "Month" mont is filled on the basis of to-date data. Field is required
* General: Backup SQL database, the possibility of defining number of days (interval)
* Created by: added charts for all qualifications (planned / spent hours)
* Created by: Changing the date of operation (work) in the form of the work order did not alter the date
* Građ. Book: move quantities of evidence is not good to show evidence of move quantities
* Warehouse: Clear transfer note and desist, eraser side of the input items.
* Warehouse: Copy storage of documents with items
* Warehouse: When creating harmony. Delivery note from documents or work order, enabled selection of any warehouse

GALA2009 - 30.09.2008.

* General: Updating can handle only with administrator rights
* Bill of quantities: enabled changes agreed bill of quantities for the same even if there is no plan or payment certificate
* Bill of quantities: if the bill of quantities is not agreed upon, allowed moving items within tasks, and increase / decrease in prices, no matter if the project was made 
* Bill of quantities: Copy the selected items, type or copy the selected items added to all items in general. plans and the final situation for the current project
* Bill of quantities: Info on the bill of quantities contains additional information (the value with no earnings, earnings, the value of labour, materials, machinery, charts, etc.)
* Items: Copy from the previous analysis of bill of quantities
* Items: Sets - possibility to enter / define a set of items, such as distributing cabinet, 3 sets (complete with parts)
* Report: payment certificate - Cost of materials per payment certificate (cost estimate: a situation), resume building payment certificate - of up to date, resume building payment certificate - for the month
* Report: bill of quantities - sets of prints, evidence of the quantities of items
* Book of quantities: fast processing derived quantity in a new window
* Materials: Entering a new material input suppliers is not record suppliers

GALA2009 - 08.09.2008.

* General: Version 2009, a user-defined layout using templates. New features, MS Office 2007 Ribbon
* General: Added complete standard dry construction
* General: Logo can be in JPG, BMP or WMF format
* Standards: increased number of decimal places to 6 (work, material, machinery)
* Standards: Standards for adopting a bill of quantities item or an item from activity in network plan
* Building Book: Making payment certificate is transmitted label items if the item bill of quantities was "drawn" under the basic
* Projects: The selection of projects added table column Ordering
* Bill of quantities: Export / Import bill of quantities with resources (labour, material, machinery). The export / import enables communication between users regardless of the price list, complete with extra analysis
* Bill of quantities: Automatic import items from MS Excel and the bill of quantities, which is exported from Gala
* Bill of quantities: Import from MS Excel importer and the price (if registered)
* Bill of quantities: 3 new print with the amount of letters
* Bill of quantities: Copy currently illuminated with a bill of quantities bill of quantities table
*bill of quantities items: Change the amount of analysis (which has "children") did not count change for sub analysis other than just for the current analysis
* Items bill of quantities: When the bill of quantities is agreed upon, the price does not change regardless of the work with extra analysis, automatic recalculation and display (normative / contracted)
* Items bill of quantities: The possibility of "lock" the price and bill of quantities, if not agreed upon (at an extra analyzes changes do not affect the unit price)
* Items bill of quantities: Display tag standards (taken from the book of standards) for the current secondary analysis.
* Base material: name / price can be changed regardless of whether the material is stored using
* Operating plan: to join the activities, the ability to "disconnect" - back to the initial state
* Operating plan: the possibility of entering arbitrary actions such as the cost for the network plan
* Network Plan: Significant work in optimized network plan (gantt chart)
* Network plan (organization): description of the activities include a bookmark item, tag and analysis supporting their own description of the activities
* Network plan: WBS item if there is no activity in the Gantt view gets milestone status (0 days)
* Network plan: Zoom (increase / decrease gant the timeline)
* Network plan: For added shape Activities Milestone field (the duration of 0 days)

GALA2008 v7.1 - 26.06.2008.

* General: New installation procedures, the choice of SQL Server and set parameters for network operation
* General: Corrected errors in multiple input items (entry, stop, enter, save the error caused a "double entry")
* Items: evidence of the item quantities bill of quantities
* Prices of materials: Corrected show (filter) the registers for the selected rates
* Organization of construction: banned from entering the same WBS items
* Construction management: taking over the activities performed in the order in the bill of quantities
* Construction management: a multiple labelling activities - deleting, registering subcontractors
* Network plan: subcontractor activity can not be a milestone (Milestone)
* Construction of books: The transfer of evidence of the quantities of sales, copy of previous evidence quantities of liquid items, or copy from any item of the current project or all projects, or bill of quantities
* Building Book: Moving evidence of quantities up / down
* Report: added to the bill of quantities listing of the technical description for each type of work, + the standard bill of quantities with the title page
* Report: hierarchical printing papers (bills of quantities, payment certificate)
* Report: Import report in report manager

GALA2008 v6.1.1 - 09.06.2008.

* In general: the custom formulas for the project, bill of quantities, work order, the operating plan, the situation added option to define variables in the program, e.g. PROJ:Project_ID
* Operational Plan: Online activities from Op. Plan to take in the order of activities
* Network plan: The unnormed tems, corrected an error in the duration of 0 days of activities, also with subcontractor items
* Organization of construction: if there is no activity in the operating plan than the realization is not possible until the new activity is saved.
* Network Plan: Linking the activities of non-standard items were not properly
* Reports: designer moved to a new reports for the account, log building, work order

GALA2008 v6.1 - 01.06.2008.
* Bill of quantities: the index rate and the planned earnings for the S-curve of money
* Network plan: Export the network plan in MS Project 2003 and 2007, and Primavera 6.0. Export WBS, a duration of activities, links, implementation (efficiency)
* Network Plan: S-curve of expected income and expenditure (money)
* Network Plan: S-curve with the selected type of employees, and for all working hours
* Network plan: 12 new S-curve outputs (implementation, working hours (e.g. Masons type of employees or all), the selected material, machine, expected income, expected expenditure) - daily or periodically
* Network plan: added new Histograms (total 10) for the activities, the selected type of employee , number of employees per day, the selected material or machine - the earliest and latest dates
* Network Plan: Enter / update directly from a network implementation plan, the duration of the recalculation
* Network plan: For all S-curves (charts) added descriptions of the X and Y axis
* Book standard: Added types of employees to positions of extra analysis 
* Book standards: It is possible the amount of auxiliary registration mark (by adding a final analysis of the primary)
* Book standards: Changing the amount of the basic unit analysis of all changes in the additional amount, changes in unit quantities of secondary analysis of the changing amount of its extra.
* Book standard: pressing combinations of keys CtrlF4 show all basic and auxiliary analysis of the basic analysis (which is not normally seen in the table)
* Prices: No deletion of resources (material / machine) from the price list if the resource is in any price list used in the analysis (cost estimate, op. Plan), the realization of material, document storage, standards, baseline-to resources. If not, the resource is deleted from all price lists and databases (materials / machine).
* Items: Disabling change items in which the use of auxiliary analysis and change them, the program saves the changes regardless of the interruption by the user.
* Items: Print prints in the analysis of extra tree analysis
* Items: Display prices without planned income
If there is a payement certificate, advance can be procesed only form the certificate, otherwise for the project.
* General: For all the resources added unit resources / unit standards or activities
* General: Updated version does not affect the serial number

GALA2008 v5.2 - 09.05.2008.

Organization *: Enabled delete all screenings (Calendar)
* Operating plan: Added display of planned hours by type (carpenters, masons ...) to display the S curve
* Realization (work order): Added date of work (to and from) the registration of working hours
* Realization (work order): Added hours of employees on standby 
* Realization (work order): Enabled changed the date on implementation of materials and machines (date must be within the date of work order)
* Realization (work order): Added implementation dates of each activity, for recalculation of the duration of activities in the network plan
* Created by: Date added (DO) on the implementation of labour, materials and machines to display resources in the S curve
* Network plan: the duration of activities is still at the opening recalculated in relation to finished
* Network Plan: The curve of work (by type of employees), materials (selected material) of the machine (the machine selected)
* Staff: Added note
* General: Arbitrary definition label document: projects, bill of quantities, payment certificate, operating plan, work order - the possibility of combining the values
* General: Disabled entry of the same materials and machines within a single standard in the book of standards, items of bill of quantities, the operational plan of activities
* General: Increased number of decimal places from 2 to 4 in the norms and extra analysis
* General: corrected error when changing the description of the item bill of quantities - in construction. book name was not changed properly (if the item bill of quantities was descriptive, and so that was formed by moving to the right)

GALA 2008 v5.1 - 15.04.2008.

* Reports: Analysis of the item - print-type employees (if given the standards of work) or in groups unless
* Created by: the possibility of realization of the registration (with quantity) and percentage
* Network plan: View / Print resources (labour, material, machines) for selected or all WBS's - planned or actual
* Network plan: View / Print the necessary resources for the period (the required number of people, hours, materials, machinery)
* Network plan: View / Print the expected income / expenses per month
* Organization (Network Plan) provided clear projection of (calendar)
* Organization (Network Plan): Record activities in which there is no operational plan
* Organization (Network Plan): The possibility of change of the optimal number of employees
* General: fixed smaller bugs:
- Transfer of partners at copying the broadcast partner of the project from which the copy
- Sort by type copying papers
- Amounts in cost. payment of the certificate were differences in lips
- Show investors on standards has not changed after refresh of the project

GALA 2008 v4.1 - 13.03.2008.

* General: Prices of increased prices at 7 (unskilled, semi-skilled, KV4, KV5, KV6, VKV7, VKV8)
* Standards: The visible price in the book of standards based on the selected price list
* Network plan: The ability of activities (with the same activity) show a description of items bill of quantities.
* Registers: Changing the registry (materials and machines) in the price list, or change the registry based on all price lists and database
* Construction of books: the possibility of setting any document to each of the book list (Excel, Word, PDF, images ...)
* Projects: Added search (Ctrl + double click)
* Projects: Contracted added column and display notices
* Projects: Sort (remembered by the user)
* Projects: Fixed refresh after a Drag & Drop classification project
* Projects: Fixed refresh the amount of VAT (agreed value)
* City: added search (Ctrl + double click)
* Materials - added tab + column supplier 
* Prices of materials: added vendor tab + column supplier

GALA 2008 v3.1 - 11.02.2008.

* New module: Subcontractors (export-import, compare, review the network level)
* General: A selection of video films covering the most important processes in the application, the direct link is here.
* General: Print transferred to a new reporter - simple changes by users
* Projects: Possibility of defining the different VAT rates, currency marks and logos (other countries)
* Warehouse: The tabulation added supplier of the Receipt and the shipping expenses
* Warehouse: Print card materials (condition) for the current or all storage
* Book of quantaties: enabled izvedenosti enrollment as a percentage of the tagged items
*Payment certificate: added field overall value and the value of rebates / bonuses in the form
* Items: Increase / decrease in cost of the entire bill of quantities or types or individual

GALA 2008 v1.1 - 07.01.2008.

* New module: Network planning
* Projects: arbitrary classification of projects (years, active, contracted, etc.)
* Operating plan: When creating an operating plan (if items are not regulated) activity becomes very paragraph
* Operational Plan: Connecting the activities in the operating plan
* Operational Plan: Separating the activities in the operating plan
* Operational Plan: added column and the chart for the data "should be spent"
* Warehouse: Fixed error in choosing the date of the warehouse documents
* Food: Copy the norm in the book of standards
* Food: Switching between types of norms works drag-drop method
* Items: The transfer of resources in the standard descriptive items (valuation analysis copying resources)
* Items: enabled the Greek symbol, the description of the item format
* Items: Additional option of defining the descriptive items (move right)
* Network Plan: Baseline, an unlimited number of storage to 1 projection (Calendar)
* Network Plan: Unlimited number of screenings (Calendar) to 1 (active) plan
* Network plan: reports planned / spent resources, the expected income / expenses per month
* Bill of quantities: Added recap (Rabat, cost ...)
* Bill of quantities: The possibility of VTR bill of quantities with the appropriate processes for the situation and the operational plan
* Bill of quantities: Export bill of quantities in Excel
* Bill of quantities: Update items to possible forms (Next-Previous)
* Bill of quantities: Export / Import bill of material quantities
* payment certificate: Added recap (Rabat, cost ...)
* payment Certificate: Two new reports (Building Book)
* Created by: The choice of activities, added a table of items with filter for easy search
* Created by: 6 new printing business hours (cumulative)
* Try: Started transfer all the FastReport report. Each report can be exported to Excel, Word, PDF, image (JPG, GIF ...), nd sent through e-mail.
* General: Automatic updates from the Internet (for users on maintenance)
* General: Added info window (projects, bill of quantities ...)
* General: The settings table is added on public holidays - by making the operating plan, holidays are automatically downloaded
* General: With the current up and down, added scroll left to right in the papers, Bill of quantities (hierarchy)
* General: Operation plan, network plan, implementation and payment certificate is processed for all of the agreed bill of quantities. The possibility of processing the item if there is no amount of realization, although the coontract has been signed.

GALA 2007 v1.4 - 22.11.2007.

* MS SQL database (optional)
* Bill of quantities: considerably facilitated development - multiple entry type work
* Items: Multiple input items (from the book standards) drag-drop method
* Items: Transfer item description drag-drop method from any application
Operating Plan *: Enabled creation of an unlimited number of plans with the possibility of a complete change of technology (resources) for the contracted items
* Operating plan: a detailed comparison of resources (labour, material, machinery) in the selected plan, without prejudice to the agreed price.
* Operational Plan: Export and import of materials in MS Excel (for commercial processing and recalculation) transferred from the bill of quantities on the plan
* Project: to be admitted to advance immediately issue an invoice
* Materials: Austin input code material that already exists
* Materials: Added Field Supplies
* Created by: the possibility of realization of the daily work, materials, machinery, creating evidence of quantities and automatic transmission in the book of quantities
* Created by: Review did not register daily implementation
* Created by: New base-base vehicles
* Finance: Financial prints with a review of published and closed the account and certificate payment, filters for the project, partner, date
* payment certificate: No derivative book of items quantities not printed
* payment certificate: temporary deposit
* Building Book: significantly enhanced production of evidence of quantities with formulas and pictures

GALA2007 v1.1

* General: Warehouse material - Receipt, dispatch, izdatnice, međuskladišnice
* Created by: It's possible to create delivery notes for the realization of material
* General: Export / Import of planned materials in MS Excel files to a commercial processing and subsequent recalculation
* General: Automatic backup with the possibility of defining number of archives or
* General: Access Rights
* General: Link to external documents (PDF, MS Word, MS Excel or any other document)
* General: A database of cities with all the postal codes in Croatia
* General: Verziranje program - Current Version 2007 1.1 (year, month, day of realization)
* General: Required fields on the forms stand out in comparison to the other (when selecting the field)
* Planned expenditure: Overview of expenditure of labour, materials and machines per item
* Items: The ability to automatically open the table with the norms of the overwritten
* Items: Possibility of defining the descriptive items (m3 Concrete, Formwork m2 ...)
* Items: Added tab in the description of the item description for formatting (Ctrl + TAB)
* Items: Added a new window for processing descriptions of items (double-click the left mouse button)
* Items: The item is not printed if the amount of 0.00
* Items: display unit or total hours spent in the form of
* Items: The ability to automatically tag entering item (indicator species + Number of the items for the current type)
* Items: Possibility tagging/ labelling items (and therefore treatment), only one species (if the position on her)
* Bill of quantities: Hierarchical printing papers (resume)
* Bill of quantities: Disabled input implementation bill of quantities, if not agreed
* Bill of quantities: the amount and type of bill of quantities items transferred under
* Bill of quantities: Prices of description and note added
*Work: Try one for employees, for bill of quantities, project or period
* Construction of books: the evidence of quantities and measures can be added to the picture (copy / paste or directly) with the additional processing
* Partners: ability to send direct e-mail your partner (or contact person)
* Accounts: Print information about the project and bill of quantities, as long as the account linked to the bill of quantities.

GALA2006 v2.00

* Projects - 1 project can have more than one contract bill of quantities
* Projects - advance the schedule of the bill quantities
* Projects - defining Manager works, head of safety at work, the resolution of establishing the site, the requirements for the takeover, the minutes of the handover, the minutes of testing (installation, etc.), warranties, complaints
* Projects - tying the project with the National Classification of types of buildings (NKVG)
* Items - creating the possibility of entering a unit price of free labour, materials, machines, with automatic display of differences with respect to standards (comparative graph and calculate the percentages).
* Item - the possibility of setting the same items (e.g. Masonry walls d = 20 cm on the ground and the first floor)
* The items - a graphical representation of the share of labour, materials, machinery (share) in paragraphs
* Items - automatically show earnings of labour, materials, machines per item (jedinično and total)
* Construction Diary - building construction sheets daily, with the structure of employees and machinery on the site. Each entry affects the dynamics of performance (time)
* Construction Diary - the possibility of recording the amount of certain items derived, which automatically affects the dynamics (percentage of readiness items) and the book amount of quantities.
* Construction Diary - the possibility of recording hours worked per item and per worker (or more).
* Construction Diary - the possibility of recording the amount actually spent material and working hours of machines per item
* Dynamics - the ability to define a standard dynamic plan
* Dynamics - show the number of working days than are planned, with the simultaneous display of realization of each item in percentage
* Dynamics - the possibility of allocation (planning) over the period of the item (fine)
* Working hours - the ability to make work evidence automatically from the building daily, or independently (for the period - for employees)
* Working hours  - Views of bill of quantities for the project (more bill of quantities) or period (regardless of place of work employees)
* Cost of materials and machines - the ability to automatically generate the daily consumption of the building or independently
* payment certificate - the recording of advance (or successive free calculation)
* payment certificate - calculation payment certificate for the project (one or more contracted bill of quantities)
* payment certificate - an overview of more or less implied derivative works with quantities and amounts
* Reporter - done predefined reports with the possibility of an unlimited number of your own statements.
* Payments - the ability to automatically create more war (accounts)
* General - Additional filters for quick results

GALA2006 v1.60

* The dynamics of work includes additional works.
* Calculation of employees. When filling in the realization of the work, the program gives you a choice of workers who are given work day, so call for a given accounting period you get the amount of working hours per worker.
* Import bill of quantities or items from MS Excel files. Import names, units of measure, quantity of items and papers.
* Export bill of quantities in MS Excel format. Export with or without the price, marked, or all items.
* User adjustable height lines in tables
* Book of quantities (derived quantities) are directly based on the full implementation, and thus the process of making payment certificate and book of quantities are automated. The data leads to concern about additional works during execution.
* Items include the realization of (the hours spent by qualifications) and  the amount per unit, and the value derived per item.
* Based on work performed, the realization remembers working hours per employee, so you can get a bill hours employees or all employees, for the current project or all projects, as well as date range.
The option of charging book quantities for all items from the bill of quantities.
* Inability to change / delete payment certificate and / or quantities of the book as it is not about the last payment certificate. Hereby passed the possibility of error when calculating the derivative works.

GALA2006 v1.52

* Direct evidence of processing quantities at each book of item quantities. The possibility of positioning of text in evidence of quantities and description of item construction. books.
* View book list looks of quantities.
* Added Contractor and Client on each sheet construction. Books
* Renumerations of relevant numbers of items bill of quantities depending on the number of types of works
* The dynamics of work. Creating a dynamic plan works, export to JPG, save / load dynamics (planning)
* Graphs of implementation, materials and machines are not refresh after entering or changing

Version: v1.51

* Added option in the settings program to print the entire width of the item or half pages.
* The book of quantities: added options for print only of selected or all items.
* The book of quantities: Tagging al itemsl, removing the designation of all (for printing)
* The form book of  quantities incloses quantities of measures.
* Number of items that is related to the numbered papers (1.1, 1.2, 1.3, etc.).

Version: v1.50

Processing Menu * -> Tag / Untag items, mark / Removing tags from all the items, the increase / decrease in price for tagirane / tagged items
* Added module planning (plan) with the graphics and printing.
* Added module implementation. Realization - Monitoring expenditure of labour, materials and machines with graphical display and print.

Version v1.10

* Corrected error when printing book of quantities

Version v1.00

* Realised version 1.0

 

Contact

Email: gala@gala-software.eu

Tel: +385 (91) 402 6033
Tel: +385 (91) 603 6023

Monday - Friday 08:00 - 17:00

Partners

Croatia
DEMO Informatica d.o.o
.
Trg Ljudevita Gaja 6, 31000 Osijek
Tel. 031 251 010

Bis dat d.o.o.,
Hektorovićeva 38,21210 Solin
GSM: 098 413 042

Tehning d.o.o.
Donji Ćikovići 104, 51215 Kastav
Tel: 051 625 992

Infomiks usluge d.o.o.
Lermanova 10, 10000 Zagreb
GSM: 098 9817 123

Times computers d.o.o.
Ožujska 12, 10000 Zagreb
Tel: 01 4444 200

Bosnia and Herzegovina
FIM NET d.o.o., Tomislavgrad
GSM:00387 63 357860

Montenegro
REFAN MNE d.o.o., 
29.Decembra 29, Herceg Novi 
GSM 068 759579

Newsletter